2010 Boddington “Saddleback” Mine

TCG Industries have fabricated and supplied many items for this project. To enable the conveyor belt construction to withhold the poured concrete, TCG Industries fabricated ten “Ground Footing Jigs”. A large jig fabricated to within 1.5mm tolerance, these pieces were placed by crane to allow the pouring of multiple concrete footings at one time.

Temporary Workshop Shelters – TCG fabricated and supplied the framework for the temporary workshop shelters on site as well as work benches for on site use.