2010 Gorgon Project
TCG Industries fabricated and supplied cable drum frames to several large clients involved in the initial stages of Electrical Works at the Gorgon Project.
The 12 Tonne Cable Drum frames were supplied with a braking system to allow ease of operation. Engineered drawings and Strength Weight Loading Certificates were also supplied.